Homeowner buyer's guide

Hiring a retaining wall construction contractor in Oakville

A retaining wall is holding back soil under load, so drainage and engineering matter more here than in almost any other exterior project. In Ontario, walls over roughly 1 metre, about 3.3 feet, typically require a building permit and often engineered drawings, and a contractor who is not fluent in that rule is a warning sign on its own.

What to look for

  • Clear understanding of when a wall over 1 metre needs a permit and engineering
  • Experience with segmental block, natural stone and poured concrete systems
  • A defined drainage plan, including gravel backfill and weeping tile behind the wall
  • Proper base compaction and setback from property lines or structures
  • Photos of walls at least a couple of years old to check for bulging or settling

Questions to ask

  • Does this wall's height trigger a permit or engineering requirement here?
  • What is the drainage plan, and will there be weeping tile behind the wall?
  • How is the base prepared and compacted before the first course goes in?
  • Who is the engineer of record if drawings are required, and are they included in price?
  • What is the warranty on workmanship for settling or bulging after installation?

What it tends to cost

Cost is driven mainly by wall height, length, material and how much excavation and drainage work is involved, so a low garden wall in segmental block generally costs far less per foot than a tall engineered wall in natural stone. Taller walls also carry engineering and permit fees on top of construction, so ask whether those are included in a quote or billed separately.

Red flags

  • Proposes a wall over 1 metre with no mention of a permit or engineer
  • No drainage or weeping tile plan behind the wall
  • Skips base compaction or shortens the buried base course to save time